In June 1998, POWERCORP installed an ENERCON E30 230kW wind energy converter at Denham a small town in Western Australia located approximately 850km north of Perth and 50km south of Monkey Mia. The high-tech turbine was integrated into an existing isolated grid consisting of four diesel generators.

Tower view of Denham horizon
Tower view of Denham horizon
The control system for the wind/diesel combination was developed in-house by POWERCORP, using the company's proven IPS technology. The implementation of the wind turbine and the smart control system has resulted in diesel fuel savings of 175,000 litres per year and a reduction of 500 tonnes per annum of greenhouse gases. In addition to this, consumers now enjoy a more reliable power system that is able to re-start itself after a black-out without operator intervention.

In September 1999, Stage II of this leading-edge project has completed with the installation of two further ENERCON wind turbines (each 230kW) in conjunction with a complete upgrade of the diesel generator control.

The planned addition of energy storage flywheels to further reduce the fuel consumption at Denham however, was abandoned after it was demonstrated that the supplied flywheels did not meet the stringent requirements of both Powercorp and Western Power.

To overcome this obstacle, Powercorp developed and installed the world’s first “Low Load Diesel” generator in 2002. This generator, with a special mix of power electronics, modern common fuel rail diesel generation from Detroit and careful combustion temperature control is able to run very lightly loaded (down to below 10% of it’s prime power rating) virtually indefinitely, with a negligible increase in maintenance costs. The advantage behind this philosophy allows the diesel power station to run enough generators to cover the entire consumer load (to prevent black-outs in the event of a wind turbine failure) whilst still utilising the maximum possible amount of wind-energy.

Following the success of the first low load diesel, in 2005 Powercorp installed a second unit at Denham to further increase the utilisation of wind power and reduce the consumption of diesel fuel.



Image

Client:                                      Western Power Corporation   

Location:                                 Denham, 850km north of Perth, Western Australia

Principal Contractor:               POWERCORP Pty Ltd

Turbine Manufacturer:           ENERCON GmbH

Contract Award Date:           STAGE (1) - December 1997
                                               STAGE (2) - December 1998

Completion Date:                   STAGE (1) - June 1998
                                              STAGE (2) - December 1999

Project Value:                       $5.1 Million


< Previous

Main Menu
Home
···································
About Us
···································
Products & Capabilities
···································
PowerStore Flywheel
···································
Wind Diesel
···································
Solar Diesel
···································
Wind Farms
···································
Automated Stations
···································
Manufacturing Facility
···································
Testing Facility
···································
Downloads
···································
Partner Links
···································
Latest News
···································
Contact Us
···································
Search
···································
Industry Links
···································
Powercorp Alaska
···································

Powercorp Operations P/L ABN - 45 070 662 369   |   Powercorp Research & Development P/L ABN - 47 099 592 819   |   Powercorp Alaska LLC
Export Drive,  Darwin Business Park,  Berrimah,  N.T. 0828   |   p:+61(0)889470933   |   f:+61(0)889470925   |   email: mail@pcorp.com.au